Warning – Allstar Products Group MVP-SQ User Manual

Page 6

Advertising
background image

FRONT MOUNTING BRACKET MUST BE INSTALLED TO A
STRUCTURAL SUPPORT (STUD) ON THE HEADER WALL.

FAILURE TO DO SO COULD CAUSE SENSING SYSTEM TO

MALFUNCTION, RESULTING IN ENTRAPMENT, INJURY

OR DEATH. REINFORCE HEADER IF NECESSARY USING

A 2 x 6 AND LAG SCREWS (NOT PROVIDED).


WARNING

STEP 1:

Mounting the Front

Bracket — Mark a vertical centerline
on the header above the door. By
manually raising the door, determine
the high arc of the door’s travel (see
illustrations on page 4) and using a
level, transfer this measurement to
the header (see illustration at left).
Draw a horizontal line, crossing the
previously drawn centerline, at this
point. Install the Front Mounting
Bracket securely with the lag screws
as illustrated below. If necessary,
reinforce the header with steel angle
iron or wood to ensure a secure
mount.

STEP 2

: Raise the Tee Rail so that the

Front Idler Bracket and Front Mounting

Bracket align. Insert bolt and tighten nut

loosely for now. Later in the installation, this

nut must be tightened securely.

104372

INSTALLING THE OPENER

6

HORIZONTAL
LINE

VERTICAL
CENTERLINE

104369

STEP 3:

Raise the Opener and rest the

Power Unit on a ladder or other sturdy support.
Open the door to the full open position. Allow
2" of space between the Tee Rail and the top
section of the door (as shown in the illustration
on the top of page 7, left).

VERTICAL
CENTERLINE

104371

HIGH ARC (RISE)

HORIZONTAL LINE

LAG SCREWS

5/16” X 1-7/8”

Advertising
This manual is related to the following products:

MVP