Instalando los ductos, Installing the ductwork – Broan 46000 User Manual

Page 4

Advertising
background image

4

INSTALANDO LOS
DUCTOS

NOTESE

ESTAS INSTRUCCIONES SEGUIRÁN LOS PLANES
HECHOS EN LA PÁGINA 2. COMIENCE EN LA
PARTE EXTERIOR Y TRAIGA EL DUCTO HACIA
EL EXTRACTOR.
PARA EL MEJOR RENDIMIENTO DE SU EXTRAC-
TOR, USE EL CAMINO MÁS CORTO DE DUCTO Y
UN MÍNIMO DE CODOS.
NUNCA DESCARGUE EL AIRE DEL EXTRACTOR
EN EL ESPACIO DE LA BUHARDILLA PORQUE
UNA ACUMULACIÓN DE GRASA PODRÍA CAUSAR
UN INCENDIO.
USE SOLAMENTE DUCTOS DE METAL (NO USE
DUCTOS DE PLÁSTICO). ENSÁMBLELOS BIEN DE
MANERA QUE EN CASO DE QUE HUBIESE UN
INCENDIO CAUSADO POR GRASA, EL INCENDIO
SE QUEDARÁ CONTENIDO DENTRO DE LOS
DUCTOS DE METAL.
ES UNA BUENA PRÁCTICA EL PONER CINTA EN
TODAS LAS CONEXIONES DEL DUCTO
HACIÉNDOLOS NO SOLAMENTE SEGUROS SI NO
TAMBIÉN A PRUEBA DE ESCAPE DE AIRE.

15. Siga las direcciones apropiadas abajo para el tipo

de ductos que esté instalando:

CASQUETES DE PARED (FIG. 9)

Use una sierra sable para cortar un hueco ligeramente

más grande que el diámetro del ducto de manera que

el ducto se alinee más fácilmente con el extractor.

Instale tiras de sostén en las paredes exteriores que

estén acabadas con superficie exterior de madera,

aluminio o vinilo. Ensamble los ductos y ponga cinta

en todas las uniones. Traiga los ductos de afuera hacia

al extractor. Sujete el casquete de pared a la última

sección de ducto y clave el casquete a la pared. Selle

alrededor de la ceja del casquete con un compuesto

para rellenar. Asegúrese que hay suficiente ducto que

entra a la cocina de manera que el ducto sobrepasará

y entrará dentro el conector de regulador/ducto por lo

menos por 3/4" cuando esté el ducto instalado.

CASQUETES DEL TECHO

Corte un hueco en el techo más grande que el diámetro

del ducto de manera que el ducto se alineará más

fácilmente con el extractor. Recorte el tejado (tablillas

de tejado) alrededor de hueco de manera que quepan

apretadamente alrededor de casquete cuando éste

instalado. Ensamble los ductos y ponga cinta aislante

en todas las uniones. Traiga el ducto hacia abajo, al

extractor. Recorte el ducto paralelo a la inclinación del

techo, dejando 3/4" de ducto que se proyecte más

arriba de techo. Selle la abertura alrededor de ducto

con cemento de techo.
Instale el casquete insertando el filo de atrás de la

ceja del casquete debajo de las tablillas del tejado.

Selle alrededor del casquete con cemento de techo y

selle todas las cabezas de clavos y tablillas que fueron

cortadas o levantadas.
Asegúrese que haya suficiente ducto que se proyecte

dentro la cocina de manera que el ducto sobrepase al

conector de regulador/ducto por 3/4" cuando el extrac-

tor esté en su sitio.

INSTALLING THE
DUCTWORK

NOTE

THESE INSTRUCTIONS WILL FOLLOW THE
PLANS MADE ON PAGE 2. START AT THE EX-
TERIOR AND RUN THE DUCT BACK TO THE
RANGE HOOD.
FOR BEST PERFORMANCE OF YOUR RANGE
HOOD, USE THE SHORTEST POSSIBLE DUCT
RUN AND A MINIMUM NUMBER OF ELBOWS.
NEVER VENT A RANGE HOOD INTO AN AT-
TIC SPACE BECAUSE A BUILDUP OF
GREASE WILL BECOME A FIRE HAZARD.
USE ONLY METAL DUCTWORK (DO NOT USE
PLASTIC DUCT). ASSEMBLE SECURELY SO
THAT IN CASE OF A GREASE FIRE ON THE
RANGE, THE FIRE WILL BE CONTAINED IN-
SIDE METAL DUCT WORK.
IT IS A GOOD PRACTICE TO TAPE ALL DUCT
CONNECTIONS, MAKING THEM BOTH SE-
CURE AND AIR TIGHT.

15. Follow appropriate directions below for type of

duct work you are installing:

WALL CAPS (FIG. 9)

Use a saber saw to cut a hole slightly larger than

duct so duct will line up easily with hood. Install

casing strips on outside walls finished in siding.

Assemble the duct work and tape all joints. Run

duct work back to hood. Fasten wall cap to last

section of duct and nail or screw cap to wall. Seal

all around flange on wall cap with caulking com-

pound. Make sure that enough duct runs into the

room so that the duct will overlap the damper/duct

connector by 3/4" when the hood is installed.

ROOF CAPS

Cut hole in roof slightly larger than duct so duct

will line up easily with hood. Trim shingles around

hole so that they will fit snugly around hood of cap

when cap is installed. Assemble the duct work and

tape all joints. Run the duct work down to hood.

Trim duct parallel to roof pitch, leaving 3/4" of duct

projecting above roof. Seal all around duct with

roof cement.
Install roof cap, inserting back edge of cap under

shingles. Seal around cap with roof cement and

seal all nail heads and shingles which were cut or

lifted.
Make sure that enough duct runs into the room so

that the duct will overlap the damper/duct connec-

tor by 3/4" when the hood is put into place.

FIG. 8

FRONT OF CABINET
PARTE FRONTAL DEL
GABINETE

VERTICAL DUCTING AND WIRING
(Through Cabinet Bottom)
DUCTOS Y ALAMBRES PARA CONEXION VERTICAL (A
través de la parte inferior del gabinete)

CABINET BOTTOM
PARTE INFERIOR DEL
GABINETE

BACK WALL
PARED TRASERA

FIG. 9

WALL CAP

TAPA DE PARED

3/8"

3-7/8"

HORIZONTAL DUCTING AND
WIRING (Through Wall)
DUCTOS Y ALAMBRES PARA CONEXION
HORIZONTAL (A través de la pared)

5-1/4"

5-1/4"

7-1/2"

1/8"

3/4"

1-1/2"

1-1/2"

9"

10-5/8"

6-7/8"

7-1/2"

5-1/4"

5-1/4"

9-7/8"

9"

CABINET FRONT / FRENTE DEL GABINETE

CABINET BOTTOM
FONDO DEL GABINETE

7½"

2"

5"

WOOD SHIMS

(recessed-bottom cabinets only)

CUÑAS DE MADERA

(sólo gabinetes de fondo empotrado)

ELECTRICAL ACCESS HOLE

(in cabinet bottom)

ORIFICIO DE ACCESO PARA

LOS CABLES ELÉCTRICOS

(en el fondo del gabinete)

8" DIA. ACCESS HOLE
ORIFICIO DE ACCESO

8" DE DIÁ.

3-1/4” x 10” DUCT

DUCTO DE 3-1/4” x 10”

7” ROUND DUCT

DUCTO REDONDO DE 7”

Advertising