Install the unit, 8’’ d, Warning – Broan HEPA 3000 User Manual

Page 22

Advertising
background image

4.5 I

NSTALLING

8’’ D

UCTS AND

R

EGISTERS

(

CONT

D

)

4.5.2 C

ENTRAL

D

RAW

P

OINT

(

AS ILLUSTRATED IN

S

ECTIONS

2.1.2

AND

2.3.2) (

CONT

D

)

Filtered air ductwork (Return side connection) (cont’d)

• Fix the duct connector to the forced air unit

duct using its 4 retaining screws (#8 x 3/4” long).
Seal with duct tape.

• Take one end of the 8’’ flexible duct and slide

it over the duct connector. Secure with a tie
wrap. Carefully seal the connection with duct
tape. Identifiy the duct using the blue sticker
dot included.

• Attach this duct to the

FRESH AIR TO BUILDING

port (see icon on the top of the unit), using tie
wrap and duct tape.

4.5.3 R

ETURN

-

TO

-R

ETURN

(

AS ILLUSTRATED IN

S

ECTIONS

2.1.3

AND

2.3.3)

Fresh/Filtered air ductwork (Return side connection)

Same as for Central Draw Point, described in point 4.5.2.
Stale air ductwork (Return side connection)

• Locate the stale air ductwork opening at

least 3’ (0.9 m) from the fresh/filtered air
ductwork connection. Proceed as for the
fresh/filtered air ductwork, but instead of
using the blue dot sticker to identify the
duct, use the red dot.

• Attach this duct to the

EXHAUST AIR FROM

BUILDING

port (see icon on the top of the

unit), using tie wrap and duct tape.

4. INSTALL THE UNIT

(CONT’D)

WARNING

When performing duct connections, always use approved tools and
materials. Respect all corresponding laws and/or safety regulations. Please
refer to your local building code.

0

!

3’ (0.9 m)
minimum

- 22 -

Advertising
This manual is related to the following products: