Fitting procedure – ARB WINCH BULL BAR User Manual

Page 8

Advertising
background image

Last Rev Date: 11/05/2009

Page 8 of 13

Fitting instructions# 3786410

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

19. Using a 12mm drill bit, drill two new holes in

the roller fairlead 25mm below the original
holes.

Original hole.

New hole 25mm lower.

20. Remove the three screws from the control

box and remove the cover.

21. Replace the two cables marked “A” and “F1”

and replace them with the two cables
(BLB560) supplied with the fitting kit. Label
the cables the same as the original to assist
in the wiring of the winch.

22. Place the winch on a table with the feet

facing up and using an assistant; carefully lift
the bull bar on top of the winch.

23. Attach the winch to the bull bar using two 1

½” x 3/8” bolts from the winch fitting kit, 3/8”
spring washer and 3/8” flat washers in the top
holes.

24. Fit the 4 x M6 cage nuts from inside of the

lower flange on the pan, where the stone tray
will bolt up.

NOTE: Access to this area for cage nut fitment
will be restricted once the RFL is fitted so it is
important to insert these now.

25. Position the roller fairlead, and remove the

circlips from the lower of the vertical rollers
and push the pins up to give access to the
lower bolts.

26. Fix the roller fairlead to the bar using the 1

¾” x 3/8” bolts, spring and flat washers

FITTING PROCEDURE

F1

A

Warning: Drilling operations can result in
flying metal debris, safety glasses should be

Advertising