Delivery: Mueller takes every precaution to ensure that material is delivered to the customer damage-free and fully protected from

the elements during shipment. When the material is delivered to the customer it then becomes the customer’s responsibility to

protect the material from the elements, possible theft, and other damage. The following guidelines are recommended:

HANDLING: Proper care is required in unloading and handling panel bundles in order to prevent damage.

1. Bundles should remain banded (if possible) during the unloading process. Bundles should never be lifted by the

banding material.

2. Lift each bundle as close as possible to its center of gravity.

3. If the bundles are to be lifted with a crane, use a spreader bar of appropriate length and nylon band slings (do not

use wire rope slings as they will damage the material).

4. Depending on the panel length, some bundles may be lifted by a forklift. When using a forklift, the forks should be

spread to their maximum spacing, and the load centered on the forks.

Sheets over 25' long require two forklifts.

5. After panel bundles are opened, individual sheets must be handled carefully to prevent panel buckling or damage to

the panel coating. When removing a sheet from a bundle it should be rolled off the bundle to prevent scratching of
the next sheet. Never drag or slide one sheet over another. Sheets should not be picked up by the ends. Instead, lift the
sheet along its longitudinal edge and carry in a vertical position. For sheets over 10' long, two or more people may
be required to carry the sheet.

Wall and Roof Panels

Mueller’s wall and roof panels, including color coated, galvalume and galvanized, provide excellent service under widely
varied conditions. All unloading and erection personnel should fully understand that these panels are quality merchandise
which merit cautious care in handling.

Under no circumstances should panels be handled roughly. Packages of sheets should be lifted off the truck with extreme
care taken to ensure that no damage occurs to ends of the sheets or to side ribs. The packages should be stored off the
ground sufficiently high to allow air circulation underneath the packages. This avoids ground moisture and deters people
from walking on the packages. One end of the package should always be elevated to encourage drainage in case of rain.

All stacked metal panels are subject, to some degree, to localized discoloration or stain when water is trapped between their
closely nested surfaces. Mueller, Inc. exercises extreme caution during fabrication and shipping operations to ensure that
all panel stock is kept dry. However, due to climatic conditions, water formed by condensation of humid air can become
trapped between stacked sheets. Water can also be trapped between the stacked sheets when exposed to rain causing
discoloration, often called “wet storage stain.”

The stain is usually superficial and has little effect on the appearance or service life of the panels as long as it is not
permitted to remain on the panels. However, moisture in contact with the surface of the panels over an extended
period can severely attack the finish and reduce the effective service life. Therefore, it is imperative that all panels be
inspected for moisture upon receipt of the order. If moisture is present, dry the panels at once and store in a dry,
warm place.