Installing the pipe and pump – PHCC Pro Series Pro Series C33 User Manual

Page 4

Advertising
background image

Installing the Pipe and Pump

The Pro Series Pair of Pumps combination system
is compact and will fit in a sump pit as small as
12” wide. It measures 23¾” inches from the
bottom of the pump stand to the top of the Y-
connector where it will be attached to the
discharge pipe.

Use a pit that conforms to all
local codes, and check the
code to see if a gate valve or
ball valve if is required.

The discharge pipe must be
positioned in a downward
slope when it exits the
building, so any remaining
water will drain away. Failure
to do this will prevent water from exiting the
pit, and damage the pump if the line freezes.

The system should be placed on a flat surface
free from dirt and debris. If the bottom of the
sump pit is not clean, remove as much of the
debris as possible. The pumps are attached to a
sump foot (stand) to raise them above any
debris.

If you are replacing an old sump pump, unplug
the pump from the outlet.

1. Remove the check valve or rubber union.

Discard the check valve. The Pro Series system
contains built-in check valves, so the old check
valve will not be needed. If the existing system
is installed without a check valve or rubber
union, saw the pipe apart above the sump pit.
(Refer to the diagram in step 3)

2. Remove the old pump from the pit, and

unscrew the pipe and pipe adapter from the
pump. You can use this pipe to extend the
discharge pipe, if needed.

3. Measure the distance from the bottom of the

sump pit to the end of the discharge pipe.
Subtract 24¾” inches (the height of the pump
system + 1 inch). Cut a piece of 1-1/2” rigid
PVC pipe to that length.

4. Connect this piece to the discharge pipe by

cementing the two pieces together with a 1-
1/2” PVC pipe connector. (Follow the
instructions on the PVC pipe cleaner and
cement.) OR, (b) connect the two pieces of
pipe together with a rubber union.

5. Remove the attached cords and controllers

from the carton and place them next to the
pump system. MAKE SURE THE CORDS AND
CONTROLLERS DO NOT FALL INTO THE SUMP
PIT.

6. Loosen the hose clamps on the enclosed

rubber union, and slide the union up on the
discharge pipe until it is even with the
bottom of the pipe.

7. Lift the combination system by the handle on

the primary pump and lower it into the sump
pit. Make sure it is level.

8. Inspect the two float switches. They should

both be vertical.

9. Position the top of the pump system pipe so

that it is directly below the discharge pipe.
Slide the rubber union down until ½ of the
rubber union is covering the pipe on the
pumps, and the other half is covering the
bottom of the discharge pipe. Tighten the
hose clamp screws securely.

Page 3

END OF

PIPE

23

3

/

4

CUT

PVC TO

THIS

LENGTH

1

2

4b

4a

3

5

7

8

9

23

3

/

4

Diagram A

6

LIFT

Advertising