MBW Blitzscreed User Manual

Page 14

Advertising
background image

12

FIGURE 4

FIGURE 5

7. Install a four bolt splice plate thru the

strikeoff edging. Install a four hole

splice plate on the inside of the edging

and loosely install 4 blind nuts (see FigĆ

ures 6 and 7).

FIGURE 6

FIGURE 7

8. Make sure the bottom of the four edgĆ

ings are in the same plane. Tighten

both splice plates hard.

9. Take a right turnbuckle eye and install a

right-hand jam nut about three quarĆ

ters of the way up the shaft. Now install

the eye onto the turnbuckle a little over

half way. Do the same with the left turnĆ

buckle eye (see Figure 8).

FIGURE 8

10.Loosely install the turnbuckle assembly

directly above the flex coupling to both

clevises using a 5/8-18 X 2-1/2 bolt,

lockwasher, and a hex nut (see Figure

9). Install all the turnbuckles in the

same direction as you progress

down the screed. There is a notch cut

on one end of the turnbuckle to indicate

its direction. Remember, do not tighten

the turnbuckle hardware yet.

FIGURE 9

Advertising