Installation – Synergy 8020-20/8040-20 - Jeep JK 2 User Manual
Page 2
2 DR MODELS:
8063-10 – 2” FRONT COIL SPRINGS
8064-10 – 2” REAR COIL SPRINGS
4 DR MODELS:
8063-20 – 2” FRONT COIL SPRINGS
8064-20 – 2” REAR COIL SPRINGS
Parts / Tools Needed to complete installation:
Basic simple hand tools.
Drill with 3/8” metal cutting drill bit.
Quality jack & jack stands.
INSTALLATION:
REAR INSTALLATION
1) Begin installation at the back of the vehicle. Remove the factory track bar bolt at the axle side. Bolt #1
in the image below. Use a 21 mm socket / wrench. Retain this hardware as it will be re-used.
2) Next, jack the vehicle up and support it in a manner that will allow the suspension to hang free. Remove
the rear tires.
3) Remove the rear sway bar links. Use an 18mm socket / wrench to remove hardware labeled #1 and #3
in image 3.1 below. Retain all hardware as these sway bar links will be relocated to the front of the
vehicle.