Snorkel UL40 User Manual

Page 7

Advertising
background image

7

UL LIFT LABEL INSTALLATION: THESE LABELS SHALL BE PRESENT AND IN GOOD

CONDITION BEFORE OPERATING THE WORK PLATFORM. BE SURE TO READ,

UNDERSTAND AND FOLLOW THESE LABELS WHEN OPERATING THE WORK PLATFORM.

Note:

Labels

can

be

ordered

by

using

Part

N

umber

located

by

each

label.

For

m

achines

equipped

with

options

consult

Service

M

anual.

62218-001

2-REQUIRED

66554-002

1-REQUIRED

66550-008

1-REQUIRED

05221-000

1-REQUIRED

D.C.

UNITS

ONLY

66552-000

1-REQUIRED

D.C.

UNITS

ONLY

62217-000

1-REQUIRED

05223-003

1-REQUIRED

SERIAL

#

15001

TO

21690

62322-000

1-REQUIRED

62725-002

1-REQUIRED

62466-002

1-REQUIRED

62814-000

1-REQUIRED

62575-001

1-REQUIRED

62876-000

1-REQUIRED

03610-000

1-REQUIRED

66553-001

2-REQUIRED

62792-000

2-REQUIRED

1

AT

EACH

SWITCH

66557-009

1-REQUIRED

UL32

&

UL40

ONLY

66557-011

1-REQUIRED UL25

ONLY

66551-005

2-REQUIRED

61205-000

1-REQUIRED

62821-002

1-REQUIRED

62840-000

1-REQUIRED

005223-005 1-REQUIRED SERIAL

#

21691

TO

CURRENT

Advertising
This manual is related to the following products: