Barranca Diamond FIREBALL 2 AXLE SPHERE MACHINE User Manual

Page 12

Advertising
background image

Barranca Diamond Fireball Sphere Machine Manual Effective Date 9/28/06

12

MAINTENANCE

The Fireball Sphere Machine is assembled with factory applied grease to the adjusting threads for the

horizontal and vertical threaded bars. The user should regrease all grease fittings on the stationary and

moveable head thread zerk fittings and the base mount bearings on the drive shaft every 15 to 20 days of use

with premium wheel bearing grease. There are 3 main zerk fittings for greasing the base mount sealed ball

bearings.

The center (white) base mount bearing has waterproof seals to cope with the abrasive nature of the rock

material and water/slurry that falls on this bearing. Do not over grease the bearings (base mount) as the seals

may be damaged (one or two pumps of a lever pump action gun is all that is needed for each bearing every

15 to 30 days of use).

There are two grease zerk fittings on the vertical adjustments on both grinding head mount (one on the

outside and one on the inside). These fittings should be greased every 15 days of use. Periodically apply

grease by hand to the threads of the horizontal threaded rod.

Center base mount bearing

End base mount bearing

Grinding head external zerk fitting

Horizontal threaded rod and grinding
head internal zerk fitting

Advertising