Barranca Diamond GP6-6 Wheel Cab Maker User Manual

Page 17

Advertising
background image

17

SET UP OF LOC-LINE SYSTEM ON GP6-6 Wheel Cab Maker

The Loc-Line magnetic manifold will need to have the 3/8" OD clear tubing from the submersible pump

inserted into the other end of the 1/2" OD clear tubing (Fig 15).

The magnetic base manifold should be positioned on the metal hood of the GP6-6 Wheel Cab Maker

unit at the far right end. This position will allow for the direction of water flow to the 6" resin diamond

pads during use (Fig 17). Water flow can be adjusted with orange adjustment lever (Fig 18).

Fig 16 - Attach water tube to manifold Fig 17 - Position water nozzle on pad

Fig 18 - Water flow adjustment valve

GP6-6 WHEEL CAB MAKER OPERATION AND ADJUSTMENT

Advertising