Mk-5005s setup – Barranca Diamond MK-5005S Block Saw User Manual

Page 15

Advertising
background image

15

Before powering or starting, check for damage that could prevent this equipment from proper oper-

ation or performing its intended function. Check for binding and alignment of moving parts. Check

for damaged, broken, or missing parts.

Verify the ON/OFF switch is in the OFF position.

Before connecting the MK-5005S to a power supply, be sure the voltage, cycle and phase of the

job site power source meet the requirements of the table below.

If using an extension power cord, make sure the length and wire gauge corresponds to the require-

ments. An extension power cord that is too small in wire gauge (diameter), or too long in length,

will cause the motor to overheat and could cause premature failure.

Do not cover the motor vents as this could lead to motor overheating.

If the Diamond Blade shows signs of fatigue cracking, replace the blade before

starting work.

In order to avoid breaker tripping, a 30-amp circuit breaker should be used.

(F)

Inspect the MK-5005S for

general damage and/or loose

hardware

(D)

Inspect Wooden Strip for

excessive grooves

(E)

Verify movable Cutting Table

moves freely

(C)

Inspect the blade for damage

and verify it’s correct for the

material being cut

(A)

Ensure the ON/OFF Switch

is in the OFF position

(B)

Check all electrical connections

VOLTAGE:

230v

CYCLE:

50/60hz

PHASE:

Single phase

SETUP

Pre-start Inspection

caUTIoN

caUTIoN

NoTE:

MK-5005S

SETUP

The pre-start inspection should be performed before beginning any job.

Advertising