Elkhart Brass Cobra 7200 EXM Monitor User Manual

Page 12

Advertising
background image

12

RF Transceiver in Panel Mount

1



















2




If the Panel Mount will use RF communication, install the

RF Transceiver Module into the controller.

o

Remove the back cover from the Panel Mount

Controller using a flathead screwdriver.

o

Connect the RF Transceiver with the wires running the

length of the board as shown in the picture to the right.

o

Reattach the back cover of the Panel Mount. Ensure no

wires are pinched.

o

If the CAN leads will not be used, replace wires with

appropriate plugs.

Supply power to the controller by connecting plug 2 leads to an appropriate power source.

Install a 1 Amp fuse into the positive power lead for a 12V system (1/2 Amp for 24V system).

Refer to the respective plug figures for information on the plugs’ pins.

Handheld Controller and Docking Station –

Using the Docking Station template shown in the

Component Mounting Templates section, drill all 7/32”

holes shown through the panel intended for mounting

the Docking Station.

Mount the Docking Station with the supplied 10-24 x

3/8” screws using blue Loctite 242 or equivalent.

Torque screws to 50-60 in-lbs. The screw length allows

for a panel thickness range of 0.046”-0.125”.

Supply power to the Docking Station by connecting the plug leads shown to an appropriate

unswitched power source.

Install a 1 Amp fuse into the positive power lead of the Docking Station for a 12V system (1/2

Amp for 24V system).

Lift the Docking Station top and place the Handheld Controller into the station. Then push the

top down until the contacts connect with the handheld. (see maintenance instructions section B

for LED signals)

For instructions on converting a Panel Mount Controller to a Handheld Controller, refer to the

steps below.




Advertising