Enerpac VLP 50, 100 and 200 ton User Manual

Page 3

Advertising
background image

3

3.0 INSTALLATION (Refer to Figure 1)

WARNING: Install proper safety equipment (i.e.,
guards or control devices) as required for your
specific application.

3.1 Press Mounting

WARNING: Mount the press securely. Unstable
positioning may cause the press to tip, resulting in
serious personal injury or equipment damage.

If the press is to be mounted to the floor or some other
foundation, lower press bed to lowest set of holes before drilling
and bolting down. This will ensure that the press does not twist
and that the bed will line up with all sets of holes in the legs.

3.2 Mounting Pump Table

Attach Pump Table to Upright with hinge pin provided.

3.3 Securing Pump to Mounting Table

Attach pump to table (use screws, washers and nuts provided in
the kit) by matching mounting hole pattern.

1.

Mount Electric Pump to table at two locations using
provided hardware. See Figure 2.

Figure 2a, PUJ1200B/PUJ1201B Econo-pump

Figure 2b

2.

Mount Hand Pump to table at two locations using provided
hardware. See Figure 3.

Figure 3, P-80 Hand Pump

3.

Mount Hand Pump to table at four locations using provided
hardware. Use brackets to fasten the pump head. See Figure
4.

Figure 4, P-802 Hand Pump

3.4 Hydraulic Connections

1.

Connect the Hose(s) from the Pump to the Cylinder.

2.

Tighten all couplers and fittings.

NOTE: Use 1

1⁄2

wraps of Teflon tape on the NPTF threads,

leaving the first complete thread free of tape to ensure that
pieces of tape do not enter the hydraulic system, causing
leakage or damage.

1

1

Figure 1, VLP Press Assembly

Front of press

Front of press

1 – 3/8-16 x 1.50" long bolts required (Qty. 2)

1 – 5/16-18 x 1.00" long bolts required (Qty. 2)

upper
bed

upright

bolster
pin

lower
bed

hose

pump

gauge

pump table

Front of press

Advertising