1.7 DELIVERY, STORAGE, AND HANDLING

A.

Delivery components, sheets, metal roof panels, and other manufactured items so as not to be damaged or
deformed. Package metal roof panels for protection during transportation and handling.

B.

Unload, store, and erect metal roof panels in a manner to prevent bending, warping, twisting, and surface damage.

C.

Stack metal roof panels on platforms or pallets, covered with suitable weathertight and ventilated covering. Store
metal roof panels to ensure dryness. Do not store metal roof panels in contact with other materials that might cause
staining, denting, or other surface damage.

D.

Protect strippable protective covering on metal roof panels from exposure to sunlight and high humidity, except to
extent necessary for period of metal roof panel installation.

E.

Protect foam plastic insulation as follows:

1. Do not expose to sunlight, except to extent necessary for period of installation and concealment.
2. Protect against ignition at all times. Do not deliver foam plastic insulation materials to the Project site before

installation time.

3. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction.


1.8 PROJECT CONDITIONS

A.

Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit
assembly of metal roof panels to be performed according to manufacturers’ written instructions and warranty
requirements.

B.

Field Measurements: Verify locations of roof framing and roof opening dimensions by field measurements before
metal roof panel fabrication and indicate measurements on Shop Drawings.

1. Established Dimensions: Where field measurements cannot be made without delaying the Work, either establish
framing and opening dimensions and proceed with fabricating metal roof panels without field measurements, or
allow for field-trimming of panels. Coordinate roof construction to ensure that actual building dimensions,
locations of structural members, and openings correspond to established dimensions.


1.9 COORDINATION

A.

Coordinate installation of roof curbs, equipment supports, and roof penetrations, which are specified in Division 7
Section “Roof Accessories”.

B.

Coordinate metal panel roof assemblies with rain drainage work, flashing, trim, and construction of decks, trusses
and rafters, parapets, walls, lightning rods and other adjoining work to provide a leakproof, secure, and non-
corrosive installation.

1.10 WARRANTY

A.

Special Warranty: Steel Only – Manufacturer’s standard from in which the Manufacturer agrees to repair or
replace or components of metal roof panel assemblies that fail in materials or workmanship within specified
warranty period.

1. Warranty Period: Twenty five years (AZ-55) from date of Substantial Completion.