V mounting the boiler – Burnham FREEDOM 101008-01R1-2/07 User Manual

Page 7

Advertising
background image

7

V Mounting The Boiler

CAUTION

This boiler weighs approximately 110 pounds:

• Two people are required to safely lift this boiler onto the wall mounting hook.

• Make sure that wall mounting hook is anchored to a structure capable of

supporting the weight of the boiler and attached piping when fi lled with water.
Jurisdictions in areas subject to earthquakes may have special requirements
for supporting this boiler. These local requirements take precedence over the
requirements shown below.

A. Wall Mounting

1) If the boiler is installed on a framed wall, minimum acceptable framing is 2 x 4 studs on 16” centers. The boiler

mounting holes are on 16” centers for installation between two studs at the standard spacing. In cases where the boiler
cannot be centered between the studs, or where the studs are spaced closer than 16” apart, the boiler may be anchored to
¾” plywood or horizontal 2 x 4's anchored to the studs.

2) 5/16” x 2” lag screws and washers are provided for mounting this boiler. These lag screws are intended for mounting

the boiler directly onto studs covered with ½” sheet rock. When the boiler is attached to other types of construction,
such as masonry, use fasteners capable of supporting the weight of the boiler and attached piping in accordance with
good construction practice and applicable local codes.

3) Make sure that the surface to which the boiler is mounted is plumb.

4) Before mounting the boiler, make sure that wall selected does not have any framing or other construction that will

interfere with the vent pipe penetration.

5) Once a suitable location has been selected for the boiler, and any needed modifi cations have been made to the wall, use

Figure 5.1 to locate holes “A” and “B”. Make sure that the horizontal centerline of these holes is level. Holes “C” and
“D” may also be drilled at this time or after the boiler is hung on the wall. If the 5/16 x 2” lag screws are used, drill
3/16” pilot holes.

6) Cut the opening/s in the wall for the vent system. The recommended hole diameter for the standard 60/100mm coaxial

vent pipe is 4-3/8”.

7) Attached the wall hanging hook using the 5/16” x 2” lag screws and washers, or other suitable anchors as appropriate

(Figure 5.2). Make sure the hook is level.

8) Hang the boiler on the wall hook as shown in Figure 5.2.

9) If not already done in Step (4) locate and drill holes “C” and “D” using the ob-round slots in the bottom mounting

fl ange. Secure the bottom fl ange to the wall using the 5/16" x 2” lag screws, or other fasteners as appropriate (Figure
5.2).

10) Verify that the front of the boiler is plumb. If it is not, install washers at holes “C” and “D” between the bottom

mounting fl ange and the wall to adjust.

11) See Section VII (“Venting) for instructions on attaching the vent system to the boiler.

B. Floor Mounting

This boiler may be mounted on the fl oor using an optional pedestal kit available from U.S. Boiler. Follow the
instructions provided with this kit to assemble the pedestal, and attach it to the boiler. When this pedestal is used, the
boiler may be installed directly on a non-carpeted combustible fl oor.

Advertising