General meter setup, Basic meter setup, In chapter 5) – SATEC EM720 Operation Manual User Manual

Page 68: For ful

Advertising
background image

Chapter 5 Configuring the EM720

General Meter Setup

68

EM720 Power Quality and Revenue Meter

General Meter Setup

Basic Meter Setup

The Basic Setup provides the meter with basic information
about your electrical network.

Using the Front Display

Select Basic from the main menu. See

Viewing and Changing

Setup Options

in Chapter 3 for information on navigating in

menus.

See the table below for available options.

Using Pas

Select General Setup from the Meter Setup menu.

The following table lists available meter configuration options.

Display Label

Parameter

Options

Default

Description

Basic Configuration

Wiring

Wiring Mode

See Table
below

4LN3

The wiring connection of the
device

PT Ratio

PT Ratio

1

1.0-6500.0

1.0

The phase potential
transformer’s primary to

secondary ratio

Advertising