Installation procedure, Gprs modem installation, 5 gprs modem installation – SATEC PTS175 Manual User Manual

Page 9

Advertising
background image

‎Chapter 2 Installation

PTS175 MV Advanced Analyzer

9

Installation Procedure

Only qualified personnel familiar with the instrument and its
associated electrical equipment must perform installation and
setup procedures.

The equipment installation shall conform to the following
instructions:
a) Circuits Breakers (AC and DC) in the PTS175 must be "OFF"
b) HV Arresters must be installed closed to the PTS on the MV
lines.
c) HV Arresters and PTS must be directly grounded to earth
d) The PTS175 MV Analyzer must be directly grounded to
earth

To keep the PTS175 Ingress Protection (IP65) while
installing cables from PTS, Power Supply and GROUND to
the PTS175 MV Advanced Analyzer, use IP65 gland cable

The PTS175 supports two different power supply sources:

AC Power supply – 88-265 VAC – 50/60Hz, applied to

CB1

DC Power supply – 12VDC (can be from an external

backup unit), applied to CB2

Perform the PTS175 installation by following instructions:

1. Plug each PTS cable to the appropriate connector on the Surge

Protector ASSY. (PTS175 - item 5)

2. Connect AC power supply to CB1 and/or DC power supply to

CB2

3. connect GROUND wire to PTS175 GROUND nut

2.5 GPRS modem installation

The Modem antenna must be positioned perpendicularly to the PTS175
enclosure.

Advertising