Stack-On GORTA-56 User Manual

Top for 2 base cabinets, Warning, Assembly

Advertising
background image

WARNING

Excessive Weight Hazard

Use two or more people to

move and assemble cabinet.

Failure to do so can result in

back or other injury.

Top for 2 Base Cabinets

Assembly

1. Position the 2 base cabinets in the desired location with 1/8” (3.5mm) space

between the cabinet sides.

2. Level each cabinet using the leveling feet, making sure the tops are even.

3. Remove adhesive backed pads from packaging and apply the 4 hook and loop

adhesive backed pads to the corners of the cabinets as shown. Mount the “loop”

side of the material up.

4. Center the top with the cabinets with the finished side of the top facing up.

Place the top on the hook and loop pads and press the top in place as shown

below.

IMPORTANT: Do not attach any items to the top or move the top to overhang the

cabinet edges. This may damage the top, or cause personal injury.

40169-0910