Axle pro equipment instruction guide, Step 6: engage magnet & assemble coolant system – STEMCO Axle Pro User Manual

Page 14

Advertising
background image



Axle Pro Equipment Instruction Guide

For your protection, use Standard Shop Safety Procedures during this process

Page 14 of 24

01 577 0092

SEPT 2011

Step 6: Engage Magnet & Assemble Coolant System

a. Engage drill magnet. (Photo 6A)










b. Remove alignment bushing prior to cutting axle. (Photo 6B)







c. Assemble the coolant system: Put pump into the bucket.

Add 3 pints of coolant and 3 gallons of water and mix
thoroughly. (Photo 6C)

System comes with 3 pints of

concentrated coolant. Dilute 3 pints of concentrate with 3
gallons of water.







d. Thread coolant hose through notch in bucket. Attach screen.

Place magnetic base manifold on upper plate and align
nozzles over axle eye. (Photo 6D).

Be sure to leave enough

room for cutter clearance to allow coolant to flow without
damage to the nozzles.



Photo 6D

Photo 6A

Photo 6C

Photo 6B

Advertising