STEMCO Axle Pro User Manual

Page 5

Advertising
background image



Axle Pro Equipment Instruction Guide

For your protection, use Standard Shop Safety Procedures during this process

Page 5 of 24

01 577 0092

SEPT 2011

TABLE OF CONTENTS

Part list / Photo Glossary--

Pages 6-7

Step 1: Remove, Inspect Components & Attach Mandrels--

Page 8

Step 2: Pre-Drill Cutter & Reamer Setup--

Page 9

Step 3: Axle Alignment Assembly--

Pages 10-11

Step 4: Leveling Bar & Drill Speed Setup--

Page 12

Step 5: Alignment Bushing & Drill Placement--

Page 13

Step 6: Engage Magnet & Assemble Coolant System--

Page 14

Step 7: Drilling Procedure--

Page 15

Step 8: Second Pass Reaming Process--

Page 16

Step 9: Sleeve Installation--

Page 17

Part listing--

Page 18

Kit break downs--

Page 19

Cross-Reference-- Pages

20-21

Bore sizes--

Page 23

Failure to follow the instructions when using the Axle Pro Equipment could create a risk of personal injury to
the servicing technician and/or component damage, which may jeopardize the safety of the vehicle and that

of the operator. Do not install sleeve and/or any other axle parts in an axle that has been improperly drilled

or reamed. Components of the Axle Pro Equipment are for intended use with the Axle Pro Equipment only,

failure to use for intended purpose and/or in the proper manner may result in injury.

Advertising