2 - hardware installation, Safety considerations, Before you begin – Rockwell Automation 1425 PowerMonitor Wireless 250 User Manual

Page 15: Chapter 2, Hardware installation, Safety considerations before you begin, Hardware, Installation, Chapter

Advertising
background image

Rockwell Automation Publication 1425-UM001A-EN-P - January 2012

15

Chapter

2

Hardware Installation

This chapter describes how to install the hardware to set up the Wireless Mesh
Sub-meter Network.

Safety Considerations

The equipment must be installed in an appropriate enclosure to provide

protection to personnel and is suitable for the physical installation
environment.

Do not remove or change any part of the product, or cut any cables, as

doing so may damage it or other equipment or cause serious injury or
death.

If the equipment or any part of it is damaged, do not install it. Remove and

replace any damaged equipment.

Before You Begin

Check carefully that the PowerMonitor W250 model received is

appropriate for the system to be monitored. Otherwise, wrong or
incomplete data may be sent to the wireless PC Receiver.

Carefully read this manual and observe any notes, cautions, or warnings.

ATTENTION: Only qualified personnel, following accepted safety procedures,
should install, wire and service the PowerMonitor W250 unit and its associated
components. Before beginning any work, disconnect all sources of power and
verify that they are de-energized and locked out. Failure to follow these
instructions may result in personal injury or death, property damage, or
economic loss.

This equipment is designed to be installed in an enclosure with access restricted to
qualified personnel. Installation is to be performed in accordance with all
applicable codes, regulations, laws, and standards.

Advertising