Installation requirements, Preparing the system, Insert the output rail – Rockwell Automation 1492-PRINT220 ClearMark Quick Start User Manual

Page 3

Advertising
background image

3

Installation Requirements

• Operating Temperature: +68…95 °F (+20…35 °C)
• Power Source:

– Cat No. 1492-PRINT110: 100...120V, 50/60 Hz, 8 A
– Cat. No. 1492-PRINT220: 220...240V, 50/60 Hz, 4 A

Figure 2 - Printer Overview and Clearance Requirements - in. (mm)

Preparing the System

Figure 3 - Insert output rail

1. Insert the output rail

Maintenance Cover for Printing System

Ink Cartridge Cover

Operating and Control Panel Display

Maintenance Cover
for Waste Pad

Output Rail

Loader - Input

9.84”

(250 mm)

7.87”

(100 mm)

9.84”

(250 mm)

3.94”

(100 mm)

3.94”

(100 mm)

Advertising
This manual is related to the following products: