Protective cover installation – Rockwell Automation 1494U-D30_D60_D100 Universal Disconnect Switch Installation Instructions (30A, 60A, 100A) User Manual

Page 14

Advertising
background image

(14)

PN-224754
DIR 10001182729 (Version 01)

Protective Cover Installation

1

Position cover in front of switch as shown.

2

Spread sides apart at bottom to fit around fuse block.

3

Rotate cover up and slide top sides into tracks shown on switch.
Push in until fully inserted and pull cover down slightly to ensure
engagement.

4

Press center of cover tight to mounting plate to engage notch in right
side of cover with switch bracket.

5

Ensure flange on left side of cover has snapped under fuse block.

6

Optional: Install high-vibration application screw in bottom slot.

Advertising