Connecting the battery, Hardwiring, Connecting power and equipment to the ups – Rockwell Automation 1609-S350NS_ES Uninterruptible Power Supply - 350VA User Manual
Page 3: Front panel ( 120 v model shown), Installation, Line neutral ground line neutral ground
Advertising
4
Installation
Connecting the Battery
Remove the Battery Door, Connect the Battery, and Reinstall the Battery Door
Hardwiring
Wiring of the UPS should be performed by a qualified electrican using appropriate wire gauges.
Connecting Power and Equipment to the UPS
PUSH
TO
RESET
INPUT
208/220-240V~ 50/60Hz , 7A MAX
OUTPUT
23
325W, 2.7A MAX
0V~ 50/60H z, 500VA
L
N
L
N
LINE
NEUTRAL
GROUND
LINE
NEUTRAL
GROUND
Test
Front Panel (120 V model shown):
Advertising