Connecting the battery, Hardwiring, Connecting power and equipment to the ups – Rockwell Automation 1609-S350NS_ES Uninterruptible Power Supply - 350VA User Manual

Page 3: Front panel ( 120 v model shown), Installation, Line neutral ground line neutral ground

Advertising
background image

4

Installation

Connecting the Battery

Remove the Battery Door, Connect the Battery, and Reinstall the Battery Door

Hardwiring

Wiring of the UPS should be performed by a qualified electrican using appropriate wire gauges.

Connecting Power and Equipment to the UPS

PUSH

TO

RESET

INPUT

208/220-240V~ 50/60Hz , 7A MAX

OUTPUT

23

325W, 2.7A MAX

0V~ 50/60H z, 500VA

L

N

L

N

LINE

NEUTRAL

GROUND

LINE

NEUTRAL

GROUND

Test

Front Panel (120 V model shown):

Advertising