Megadysc system interconnections checklist, N in, Figure 4 – Rockwell Automation 1608M MegaDySC User Manual, 800 - 2400 A User Manual

Page 11

Advertising
background image

Rockwell Automation Publication 1608M-UM002A-EN-P - September 2013

11

Installation

Chapter 2

connected to the bus bar terminals labeled L1, L2, L3 and the protected load is
connected to the bus bar terminals labeled X1, X2, X3.

Figure 4 - Bus Bar Details for Utility Input and Load Output Terminations

MegaDySC System Interconnections Checklist

The following list of checks is provided for reference only. Interconnections must
be completed by factory-trained and authorized installation personnel.

Connect each MegaDySC Unit's ground cable to the ground bus in ABP
Switchboard.

Connect line side cables from each MegaDySC Unit to the respective line
input bus in the ABP Switchboard labeled L1, L2 and L3 respectively.

Connect load side cables from each MegaDySC Unit to the respective load
output bus in the ABP Switchboard labeled X1, X2 and X3 respectively.
Note: It is critical to match the phases on each MegaDySC section.

Plug the 4 duplex fiber optic cables into the appropriate transceiver found
on the control PC boards of each MegaDySC Unit's phase inverter
module.

Plug in the control wire harnesses that interconnect the enclosures at the
bottom of each unit.

Check wiring for correct source and destination locations against
approved drawings.

Check all electrical terminations for proper torque.

Refer start-up and commissioning to factory-trained and authorized
service personnel.

Right-side cut-away view of Switchboard

Detail:
Typical bus bar hole pattern

OUTPUT to loads

UTILITY INPUT

NEUTRAL

Top Entry Area

Advertising