Maintenance, Chapter – Rockwell Automation 1503 OEM Starter Frame Components Installation Manual User Manual

Page 49

Advertising
background image

Chapter

5

Maintenance

Establish a maintenance and inspection schedule for the

equipment. Annual servicing (or every 20,000 operations

– whichever comes fi rst) is the minimum recommended;

however, extreme operating conditions may warrant ad-

ditional attention.

Contactor

Refer to the following publications for detailed maintenance information

on the Bulletin 1502 contactor:

400A – Publication 1502-UM050_EN-P ( Series D)

400A – Publication 1502-UM052_EN-P (Series E)

• 800A – Publication 1502-UM051_EN-P (Series E)

These user manuals contain detailed information on installation, adjustment

and maintenance for this product.

To avoid shock hazards, lock out incoming power (see

page 3-2) before working on the equipment. Verify with

a hot stick or appropriate voltage measuring device that

all circuits are voltage free. Failure to do so may result in

severe burns, injury or death.

1) Complete the Power Lock-out Procedure (see Page 3-2).

2) Open the medium voltage door.

3) Inspect the condition of the clevis pin and cotter pins shown in Figure

5.1. Replace any worn parts.

Isolation Switch Mechanism

Inspection and Lubrication

1503-IN05E-EN-P – June 2013

A T T E N T I O N

A T T E N T I O N

I M P O R T A N T

I M P O R T A N T

Advertising