Rockwell Automation 1502 400 Amp Medium Voltage Contactor (Series D) User Manual

Page 41

Advertising
background image

Maintenance

4-13

1502-UM050D-EN-P – June 2013

Put feeler gauge here

0.030 in. [0.76 mm]

Auxiliary Actuator Bolt

Put feeler gauge here

0.030 in. [0.76 mm]

Auxiliary Actuator Bolt

Figure 4.17 – Gauging Auxiliary Contact Location

6. With the gauge in place, slide the assembly forward until the contact

actuator bottoms out. With the gauge still in place, carefully tighten the
auxiliary assembly retaining nut.

Important: Always use a wrench to hold the bolt head as you tighten the
nut. Make sure the auxiliary assembly does not move as you tighten the nut.

7. When the first nut is tightened, slide out and remove the feeler gauge.

8. Reinstall the green ground wire on the auxiliary assembly retaining bolt.

Install and carefully tighten the second nut.

9. Slowly loosen the top screw of the contactor clamping fixture to remove

the pressure on the armature plate. Loosen the two mounting screws on the
contactor clamping fixture. Remove the fixture.

10. Energize the control circuit in “TEST” mode and exercise the contactor to

verify set-up. Contactor should open and close smoothly and solidly.