Mount the adapter and i/o base – Rockwell Automation 1738-AENTR, Series B ArmorPOINT I/O Dual Port EtherNet/IP Adapter User Manual

Page 7

Advertising
background image

1738 ArmorPOINT I/O Dual Port EtherNet/IP Adapter 7

Publication 1738-IN030A-EN-P - July 2013

Mount the Adapter and I/O Base

To mount the ArmorPOINT I/O adapter on a wall or panel, use the screw holes provided
in the adapter. A mounting illustration for the ArmorPOINT adapter with several
attached I/O bases is shown below.

Mounting illustration for ArmorPOINT I/O adapter with I/O Mounting bases

Install the adapter and its I/O Mounting base as follows:

1. Lay out the required points as shown above in the drilling dimension drawing.
2. Drill the necessary holes for M4 (#8) machine or self-tapping screws.
3. Mount the adapter using M4 (#8) screws.

ATTENTION: This product is intended to be mounted to a well-grounded
mounting surface such as a metal panel. Additional grounding connections
from the power supply's mounting tabs or DIN rail (if used) are not required
unless the mounting surface cannot be grounded. Refer to Industrial
Automation Wiring and Grounding Guidelines, Rockwell Automation
publication

1770-IN041

, for additional information.

ATTENTION: To comply with the CE Low Voltage Directive (LVD), this
equipment must be powered from a source compliant with the following:

Safety Extra Low Voltage (SELV) or Protected Extra Low Voltage (PELV).

Adapter

46.2 mm

(1.82 in)

52.0 mm

(2.05 in)

20.0 mm

(0.79 in)

20.0 mm

(0.79 in)

52.0 mm

(2.05 in)

52.0 mm

(2.05 in)

44834

102 mm

(4.02 in)

56 mm

(2.20 in)