Bendix Commercial Vehicle Systems EC-60 ESP Controllers (Advanced Models) User Manual

Page 25

Advertising
background image

25

Pressure Modulator Valve Repair Tests:

1. Take all measurements at ECU harness connector pins in

order to check wire harness and PMV. Probe the connector

carefully so that the terminals are not damaged.

2. Pressure modulator resistance should read:

Location

Measurement

Release to Common

4.9 to 5.5 Ohms

Hold to Common

4.9 to 5.5 Ohms

Release to Hold

9.8 to 11.0 Ohms

Release, Hold, Common Open Circuit (no continuity)

to Voltage or Ground

Caution: When troubleshooting modulator trouble codes,

check inactive trouble codes and event history for over-voltage

or excessive noise trouble codes. If one of these is found,

troubleshoot these trouble codes first before the PMV.

Cab-mount ECU: Looking into

wire harness connector

4

Connector

Pin

PMV Location

1

Left Steer Axle Hold

2

Left Steer Axle Release

3

Left Steer Axle Common

X2

4

Right Steer Axle Hold

18 Way

6

Right Steer Axle Common

7

Right Steer Axle Release

9

Right Drive Axle Common

10

Right Drive Axle Hold

13

Right Drive Axle Release

12

Left Drive Axle Common

16

Left Drive Axle Hold

17

Left Drive Axle Release

4

Left Additional Axle Hold

X3

6

Left Additional Axle Common

15 Way (if

7

Left Additional Axle Release

ECU is configured

9

Right Additional Axle Common

for 6 modulators)

10

Right Additional Axle Hold

13

Right Additional Axle Release

X4

6

Trailer PMV Hold

12 Way

9

Trailer PMV Release

12

Trailer PMV Common

Advertising
This manual is related to the following products: