Bird Technologies 429-83H-01 Series-Manual User Manual

Page 12

Advertising
background image

TX RX Systems Inc. Manual 7-9439-6 09/03/09 Page 4

converter, and a display panel to provide visual
feedback on the system’s operating status. The
specifications for the MCU are listed in Table 3.
Also included in the system is a webpage user
interface for controlling and monitoring of amplifier
currents, alarms, and attenuators. The webpage
user interface is accessed through the front panel
LAN connector. Refer to Appendix A for instruc-
tions on accessing this feature.

UNPACKING

Each major component of the TTA system is indi-
vidually packaged and shipped via motor freight or
UPS. It is important to report any visible damage to
the carrier immediately. It is the customer's respon-
sibility to file damage claims with the carrier within
a short period of time after delivery (1 to 5 days).

PRE-INSTALLATION CHECKOUT

The following pre-installation tests should be per-
formed after unpacking the system to verify nothing
has loosened during transit. Additionally, the sys-
tem should be made operational on the bench with
all components at ground level to verify proper
electrical performance. Figure 3 illustrates all of
the cable connection points for both the tower top
box and the MCU.

The tower top box should NOT be
installed on the tower until all of the
pre-installation tests are successfully
completed.

Mechanical Inspection

Open the tower top box by loosening all the door-
clamp locking screws and rotating the clamps to

NOTE

Test
Port Trans

To

Station Receivers

To

Station Receivers

To

120

VAC

CAT-5e Cable

Test
Port

Main
Transmission

Main

Main

Test

Antenna

MCU

Tower Top Box

Lightning Arrester

TX RX part no.8-21550

Figure 3: Cable connections for system components. Model 429-83H-01-M shown.

Advertising