3 flow diagram, Flow diagram – Metrohm 850 Professional IC Anion MCS Prep 3 User Manual

Page 20

Advertising
background image

2.3 Flow diagram

■■■■■■■■■■■■■■■■■■■■■■

10

■■■■■■■■

850 Professional IC –Anion – MCS – Prep 3

8 Install sample path connections.

Connect the sample degasser (if required) (see Chapter 2.13,
page 39)
.

Installing sample preparation (see Chapter 2.14, page 40).

Connect sample path connections to the injection valve (see
Chapter 2.16.2, page 52)
.

9 Installing the MSM (see Chapter 2.18, page 56) – with associated

peristaltic pump (see Chapter 2.15, page 46).

10 Connect the MCS (see Chapter 2.19.2, page 59).

11 Connect detector capillaries .

12 Mains connection (see Chapter 2.21, page 65).

13 Connect the instrument to the PC (see Chapter 2.21.1, page 65).

14 Initial start-up (see Chapter 3.1, page 70).

15 Install the guard column (if used) (see Chapter 2.22, page 66).

16 Install the separation column (see Chapter 2.23, page 68).

2.3

Flow diagram

Figure 2 Flow diagram with sequential suppression and cation exchange
shows the flow paths when using sequential suppression (MSM (2-9) and
MCS (2-10)) and cation exchange . The arrangement of the modules in
the diagram corresponds to the front view of the instrument. Liquid con-
tainers (eluent bottle, sample vessel, waste container, auxiliary solutions
container) and guard column (see Chapter 2.22, page 66) are not
shown in the diagram. Which pressure screws, connections and couplings
are used, is described in the installation chapters of the individual mod-
ules.

Advertising