2 conditioning, Conditioning – Metrohm 881 Compact IC pro – Anion User Manual

Page 69

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

4 Start-up

881 Compact IC pro – Anion

■■■■■■■■

59

4 Deaerate the high pressure pump

Deaerate the high pressure pump(s) via the purge valve (see
Chapter 3.10.2, page 33)
.

5 Set the contact pressure of the peristaltic pump

Note

This work step needs to be performed only if a peristaltic pump is
being used.

If peristaltic pumps are used, set the contact pressure (see "Set
flow rate", page 49)
.

6 Rinsing the instrument without columns

Rinse the instrument (without columns) with eluent for 5 minutes.

The instrument is now ready for the installation of the columns (see Chap-
ter 3.18, page 54)
.

4.2

Conditioning

After the installation and after switching on the instrument, the system
must be conditioned with eluent until a stable baseline is reached.

Note

After a change of eluent (see Chapter 5.4.2.3, page 64), the condi-
tioning time can lengthen considerably.

Conditioning the system

1 Preparing the software

Caution

Ensure that the flow set is not higher than the flow permissible for
the corresponding column (see column leaflet and chip data set).

Start the PC program MagIC Net™.

Open the Equilibration tab in MagIC Net™.

Advertising