Motor and cowling installation – E-flite DHC-2 Beaver 25e ARF User Manual

Page 10

Advertising
background image

10

E-flite DHC-2 Beaver ARF Assembly Manual

3. Secure the right half of the landing gear

using two 6-32 x 3/8-inch socket head screws and

two #6 washers.

Motor and Cowling Installation

Required Parts

Fuselage

Motor w/mount and accessories

#4 washer (8)

Cowling

Hook and loop tape (2)

Motor battery

Electronic speed control

Propeller

Velcro straps

9-inch servo extension

Spinner w/backplate and screws

4-40 x 3/8-inch socket head screw (4)

Power 32 specific:

4-40 x 1-inch socket head screw (4)

Aluminum motor spacer (4)

Power 25 specific:

4-40 x 1/2-inch socket head screw (4)

Required Tools and Adhesives

Ball driver: 3/32-inch

Threadlock

Phillips screwdriver: #1, #2

6-minute epoxy

Note

Standard wheel version: We flew the prototype Beavers

on Power 25's and 3S Li-Po systems with plenty of power

for basic maneuvers and flight performance.

Float version: We flew the prototype Beavers on Power

32's and 4S Li-Po systems when using floats due to the

higher weight of the model with floats installed.

Mounting hardware is included for mounting either motor

combination in your Beaver.

Advertising