Installation instructions continued – Bradley Smoker MG-2/TT User Manual

Page 7

Advertising
background image

7

Express® Lavatory System - MG-Series with TouchTime® Control

Installation Instructions

MG-2/TT

Bradley Corporation • 215-1480 Rev. E; EN 06-915

2/8/07

Installation Instructions continued . . .

Step 2: Rough in wall anchors and electrical outlet

IMPORTANT: Turn OFF electrical power to the outlet when installing the Express®

Lavatory System.

1. Install a 110 volt GFI protected electrical outlet per local code at the location shown in Figure 2.

2. Install six 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by installer)

at the locations marked (ref. location “B” shown in Figure 1, 1a or 1b on pages 5-6).

NOTE: The dimensions for the wall anchors at location “A” are for reference only.

3. On the back of the bowl, measure the distance between the 3/4" bowl mounting holes. Divide

this measurement in half. Measure and mark this dimension on the wall to the left of the
centerline and to the right of the centerline. Install two 3/8" wall anchors with a minimum pull-
out rating of 1,000 lbs. (supplied by installer) at the locations marked (ref. location “A” shown in
Figure 1, 1a or 1b on pages 5-6).

NOTE: The anchors will be used to mount the Express® MG-2/IR bowl and frame to the wall.

Figure 2

110 VOLT GFCI
ELECTRICAL OUTLET

TRANSFORMER

LOCATION

1-1/2" NPT DRAIN

STUB OUT 2"

1/2" NPT HOT AND

COLD SUPPLIES OR

TEMPERED SUPPLY.

STUB OUT 2"

Advertising