List of contents, Series mnk-b – Richter MNK-B Series User Manual

Page 2

Advertising
background image

Series MNK-B,

close-coupled design

Page 2

9230-055-en

Revision 09

TM 7345

Edition 10/2008

List of Contents

List of Contents

2

Relevant documents

3

1 Technical data

3

1.1

Tightening torques....................................... 4

1.2

Type plate, dry-running, CE and housing
markings...................................................... 4

2 Notes on safety

5

2.1

Intended use................................................ 5

2.2

For the customer/operator........................... 6

2.3

For maintenance ......................................... 6

2.4

Conversion work and production of spare
parts by the customer.................................. 6

2.5

Improper operation ...................................... 6

2.6

Explosion protection .................................... 6

2.6.1

Filling the unit

6

2.6.2

Special operating conditions

7

2.6.3

Chargeable liquids

7

2.6.4

Identification

7

2.6.5

Check of the direction of rotation

7

2.6.6

Mode of operation of the pump

7

2.6.7

Temperature limits

8

2.6.8

Maintenance

9

2.6.9

Electric peripheral equipment

9

3 Transport, storage and disposal

9

3.1

Return consignments .................................. 9

3.2

Disposal....................................................... 9

4 Product description

10

5 Installation

10

5.1

Safety regulations...................................... 10

5.2

Installation of pump/unit ............................ 10

5.3

Alignment of pump / motor ........................ 10

5.4

Piping......................................................... 10

5.4.1

Nominal size

11

5.4.2

Nozzle loads

11

5.4.3

Suction line

11

5.4.4

Supply lines

11

5.4.5

Discharge line

11

5.4.6

Venting and evacuating

11

5.5

Pipe fittings ................................................ 11

5.6

Monitoring facilities.................................... 12

5.7

Drive .......................................................... 12

5.8

Electric connection .................................... 12

6 Commissioning/Shutdown

13

6.1

Initial commissioning..................................13

6.1.1

Filling the pump housing

13

6.1.2

Start-up

13

6.2

Operating limits..........................................13

6.2.1

Abrasive media

13

6.2.2

Min./max. flow rate

13

6.3

Shutdown...................................................13

6.4

Restarting ..................................................14

6.5

Improper operations and their consequences
(examples) .................................................14

7 Maintenance

14

7.1

Screw connections of the housing.............14

7.2

Motor..........................................................14

7.3

Cleaning.....................................................14

7.4

Stand-by pumps.........................................15

7.5

Notes on dismantling .................................15

7.5.1

Protective clothing

15

7.5.2

Magnetic fields

15

7.6

Dismantling ................................................15

7.6.1

Dismantling the slide-in unit

15

7.6.2

Dismantling of drive unit

16

7.7

Notes on assembly ....................................16

7.8

Assembly ...................................................16

7.8.1

Assembly of drive unit

16

7.8.2

Perform trial assembly of plain bearing pedestal
with impeller, inner magnet assembly and plain
bearings

16

7.8.3

Determine thicknesses S

1

and S

2

of the distance

washers 551.

17

7.8.4

Final assembly

17

7.9

Tests ..........................................................17

8 Faults

18

9 Sectional drawing

19

9.1

Legend .......................................................19

9.2

MNK-B close-coupled design ..................20

10 Assembly aids

21

10.1

Boring templates........................................21

10.2

Installation device for plain bearings .........21

10.3

Pull-off device for plain bearing bushes.....21

Advertising