5 inspection and maintenance – Trebor CP PURUS User Manual

Page 11

Advertising
background image

PURUS CP PUMP OPERATION / MAINTENANCE MANUAL

PAGE 11

5 INSPECTION

AND

MAINTENANCE

5.1 MAINTENANCE

The Purus CP has no serviceable parts. Pumps removed from service, decommissioned,
or dismantled should be decontaminated and disposed of per company policy.

5.2 MATERIALS

LIST

5.2.a Wetted

Materials

 PFA and PTFE

5.2.b Non-wetted Materials

 PVDF and PP

NOTE: PURUS CP has no serviceable parts.

Advertising