3 installation – Trebor CP PURUS User Manual

Page 6

Advertising
background image

PAGE 6

PURUS CP PUMP OPERATION / MAINTENANCE MANUAL

3 INSTALLATION

Ensure all system interlock and safety devices are functional prior to operation (refer to
Section 2, Safety Requirements). Before starting the system, it is important to read and
understand Section 4, Operation. Only trained, qualified, authorized personnel should
operate this pump.

Figure 3-1: Dimensions (in / [cm])

9.2

Advertising