Unitec CAME Wiring User Manual

Page 23

Advertising
background image


Document

Number:

GC1004

19

Document Title:

Unitec CAME Gate and Gate Controller Installation Guide

Gate

Control

Signal name

Gate

Control

Terminal

Number

Gate

Control
PLC I/O

point

Device

Connection

Descriptive Use or

Operation

Lane 1 Wash
in Use

41

Y0

Output to Wash
in use signal for
Lane 1

24VDC- is present when Gate
Controller is commanding Terminal at
Lane 1 to hold its current customer.
Signal turns off when Terminal is to
send customer through and fire wash
into queue. Note: This is a sinking
output. When testing, reference from
terminal 11(RED) to Y0. When Y0
light is on, Terminal 41(Black) to
11(Red) should measure 24VDC

Lane 2 Wash
in Use

42

Y1

Output to Wash
in use signal for
Lane 2

24VDC- is present when Gate
Controller is commanding Terminal at
Lane 2 to hold its current customer.
Signal turns off when Terminal is to
send customer through and fire wash
into queue. Note: This is a sinking
output. When testing, reference from
terminal 11(RED) to Y1. When Y1
light is on, Terminal 42(Black) to
11(Red) should measure 24VDC

Lane 3 Wash
in Use

43

Y2

Output to Wash
in use signal for
Lane 3

24VDC- is present when Gate
Controller is commanding Terminal at
Lane 3 to hold its current customer.
Signal turns off when Terminal is to
send customer through and fire wash
into queue. Note: This is a sinking
output. When testing, reference from
terminal 11(RED) to Y2. When Y2
light is on, Terminal 43(Black) to
11(Red) should measure 24VDC

Lane 4 Wash
in Use

44

Y3

Output to Wash
in use signal for
Lane 4

24VDC- is present when Gate
Controller is commanding Terminal at
Lane 4 to hold its current customer.
Signal turns off when Terminal is to
send customer through and fire wash
into queue. Note: This is a sinking
output. When testing, reference from
terminal 11(RED) to Y3. When Y3
light is on, Terminal 44(Black) to
11(Red) should measure 24VDC

Open Gate 1

51

Y4

Output to Vend
Input of Gate at
Lane 1

Tied to the Vend input of the Gate,
This line will become 24VDC- when
Gate 1 is triggered to open. Note:
This is a sinking output. When
testing, reference from terminal
11(RED) to Y4. When Y4 light is on,
Terminal 51(Black) to 11(Red) should
measure 24VDC

Open Gate 2

52

Y5

Output to Vend
Input of Gate at
Lane 2

Tied to the Vend input of the Gate,
This line will become 24VDC when
Gate 2 is triggered to open. Note:
This is a sinking output. When
testing, reference from terminal
11(RED) to Y5. When Y5 light is on,
Terminal 52(Black) to 11(Red) should
measure 24VDC

Advertising