Dual-marker/sequence valve speed, Marker shear bolt replacement – Great Plains 3N-4020 Operator Manual User Manual

Page 112

Advertising
background image

108

3N-4010F/3N-4010HDF/3N-4020F

Table of Contents

Index

Great Plains Manufacturing, Inc.

196-359M

Table of Contents

Index

2013-10-29

Dual-Marker/Sequence Valve Speed
There is one adjustment screw for unfolding speed
and one for folding speed

. You can identify adjustment

screws by markings stamped in valve body.

Turn adjustment screws clockwise (

: slower) to

decrease [un]folding speed and counterclockwise
(

: faster) to increase [un]folding speed.

With tractor idling at a normal operating speed, adjust
marker folding to a safe speed. Excessive [un]folding
speed could damage markers and void the warranty.

After adjusting the folding speed, tighten jam nuts on hex
adjustment screws to hold settings.

Marker Shear Bolt Replacement

Refer to Figure 151

The marker arm is attached to marker body with a pivot
bolt

and a shear bolt

. A third clamp bolt

acts as a

hold-down for the top of the marker shear base.

The shear bolt

is designed to fail if the marker tip gets

hung up on an obstacle. This prevents damage to the
marker.

If the shear bolt fails, replace it with a bolt of identical
size and grade, or one of similar strength.

The supplied bolt

is Great Plains part:

802-589C HHCS 7/16-14X2 GR5

This is a

7

16

-14 x 2in Grade 5 bolt. If an exact replace-

ment is not immediately available, temporarily substitute
a metric bolt, M10x0.75 Class 8.8.

Machine Damage Risk:
Do not replace the shear bolt with a higher grade bolt, or the
next obstruction may result in marker damage.

Note: Do not replace the shear bolt with a lower grade

bolt, or smaller bolt, or you may experience nui-
sance shears.

If conditions are causing frequent shears, keep spare
bolts in the storage holes of the marker shear base.

Before installing a new shear bolt, tighten the

5

8

-11x5in

pivot and clamp bolts (

,

) just enough so the marker

shear arm moves with some resistance when pushed by
hand.

Note: Repeat the above bolt adjustment step at the be-

ginning of each season.

1

2

F

S

S

Figure 150

Sequence Valve Adjustment

14048

1

2

S

F

Figure 151

Marker Shear Base

22514

1

2

3

1

2

3

2

2

1

3

Advertising
This manual is related to the following products: