Amico CSA Triplex SCD Modular Stack Mount User Manual

Page 13

Advertising
background image

www.amico.com

3.

Statement declaring that the MGEM has no fiduciary interest in the verifier and that the verifier is

not an agent or representative of the MGEM.

4.

Statement declaring that the installing contractor has no fiduciary interest in the verifier and that

the verifier has no fiduciary interest in the contractor.

C. Pre-approval

1.

Written preapproval is required for equipment not exactly matching specifications. Submit the

information required under Submittals above, attaching a cover letter stating the exact areas of

deviation.

2.

A request for preapproval of equipment must be received by the Engineer no less than three days

(72 hours) prior to bid.

QUALITY ASSURANCE

A.

Regulatory Requirements

1.

All medical gas systems work must comply in all respects with requirements of CAN/CSA Standard

related standards where applicable; requirements of the Technical Standards and Safety Authority

(TSSA).

2.

Medical gas systems work must be performed only by tradesmen familiar with the requirements of

CAN/CSA Standards who are qualified and certified for silver brazing under requirements of

the TSSA. The Consulting Engineer reserves the right to evaluate any tradesman on the basis

of the resume provided. Only tradesmen so approved may work on the medical gas systems.

3.

As required by the CAN/CSA Standards, joints in the medical gas piping must be done properly with

the interior of the piping maintained with a nitrogen atmosphere in order to ensure clean piping.

Therefore, submit to the Consultant for review prior to commencing piping work; a detailed account

of your proposed procedures for purging the piping, as well as pre and post purging procedures.

4.

The Consultant reserves the right to cut out and examine piping joints during the course of the

work or after the work is complete. If the interior of the sample piping and/or fittings are found to be

contaminated with oxidation or any other material as a result of improper installation, the piping will

be considered unaccept able, not in accordance with CAN/CSA Standards and you will be

responsible for repair as required by the Consultant to meet the requirements of CAN/CSA

Standards.

B.

Installation and Start-up

1.

The MGEM will provide authorized representatives to review installation and perform

initial start-up of the system.

C. Warranty

1.

Warranty will be expressly complete, include all components of the system and be the responsibility

of the MGEM for record only. Warranties limiting the responsibility of the MGEM for any system

component for which pass through the MGEM to another manufacturer are not acceptable.

2.

All source medical gas components shall be warranted by the MGEM of record for a minimum of 30

months from date of shipment.