Rough-in assembly wall and console – Amico Retractable Ceiling Column Outlet User Manual
Page 13
Rough-In Assembly Wall and Console
CAUTION: Ensure that the supply pressure is shut off before performing service.
Inside the “Rough-in assembly” is a secondary check valve whose function is to shut off gas flow when the “Latch-valve
assembly” is removed. This seat/seal also prevents leakage around the latch valve connector. As the secondary seal
is only a static seal, it will rarely need replacement. However, if the seat/seal does need replacement, follow the following
procedure:
1. Ensure that no pressure exists in the line by depressing the secondary check valve (5).
2. Remove the retaining ring (8) from the inside of the outlet body. Use a small screwdriver to pull the end of the
ring towards the center and then pull the ring up and out.
3. Remove the washer (7), seat/seal (6), secondary check valve (5) and secondary check valve spring (4). Inspect
items for wear or damage and replace the seat/seal (6).
4. Re-install the spring (4), secondary check valve (5), seat/seal (6) and the washer (7). Insert the retaining ring (8)
into the slot and ensure that the whole ring is seated properly.
5. Turn on the pressure and check for leaks. Re-install the “Latch Valve assembly” and perform the inspection and
test on page 1.
1
2
3
5
4
6
7
8
O
XYGEN
O
XYGEN
Note:
Rough-in Assembly Model Numbers see Page 15
Complete Outlet Model Numbers see Page 16
Repair Kit Model Numbers see Page 23
www.amico.com
13