5 operator panel connections, Operator panel connections, Operator panel connections 8.5 – Colorlight CL25 Installation manual User Manual

Page 25

Advertising
background image

INSTALLATION MANUAL CL25, CL35

Page 25

Operator panel connections

8.5


The operator panel is designed to be immersed into the bridge panel, for dimensions, see
drawing in section

17.2.1 Operator Panel.



The following connections are available on the back of the panel:

1. Power supply 9-28 VDC via local power supply on the boat or 24VDC via terminals in

the E-box. One of the benefits of supplying power to the panel from the box is that the
panel will be de-energized together with the e-box via the main switch.

2. Ethernet connection directly to the electrical cabinet or Ethernet switch via RJ45

connector. Shielded Keystone Modular Feed through Coupler, RJ45-RJ45 included.

3. Earth connection to the panel, this is needed to suppress electrical disturbances and

prevent ESD discharge damaging.


Electrical protection:
The panel is protected against wrong polarity and over-current protected by a fuse on the back,
type: T1A (Slow-Blow glass fuse 5x20mm).

1. Power cable

Fuse Holder

2. Ethernet cable

3. Earth wire

3

2

1

Wire #2

+

Wire #1

-

Advertising
This manual is related to the following products: