Assembly step 2, Assembly step 3, Fasten the rail to the opener – Craftsman 139.53975SRT User Manual

Page 9: Install the idler pulley

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Assembly Step 2

Fasten the Rail to the Opener

Insert a 1/4"-20x1 -3/4 bolt into the cover

protection bolt hole on the back end of the rail as
shown. Tighten securely with a 1/4"-20 iock nut.

• Remove the two screws from the top of the

opener.

• Attach spreaders to the U bracket by snapping

them into place.

^

• Place the U bracket, flaTsfiJe down, on the opener

and align the bracket holes with the screw holes.

Fasten with the previously removed screws.

• Align the rail assembly with the top of the opener,

and slide the rail end onto the U-bracket as far as
it wiii go.

To fasten raff, use only those screws mounted

in the top of the opener. Any other screws wifi
cause serious damage to the opener.

Assembly Step 3

install the Idler Pulley

Lay the chain/cable beside the rail, as shown.
Grasp the end with the cable loop and pass
approximately 12“ of cable through the window.
Allow it to hang until Assembly Step 5.

Remove the tape from the idler pulley. The inside

center should be pre-greased. If dry, regrease to

ensure proper operation.

Place the idler pulley into the window as shown.

Insert the idler bolt from the top through the rail
and pulley. Tighten with a 3/8" lock washer and
nut underneath the rail until the lock washer is
compressed.

Rotate the pulley to be sure it spins freely.

Insert a 1/4"-20x1-3/4 bolt into the trolley stop

hole in the front of the rail as shown. Tighten
securely with a 1/4"-20 lock nut.

Chain and

Cable

3/8" Lock

Washer

Idler Pulley

Hardware Shown Actual Size

Idler Boll

Bolt 1/4'-20x 1-3/4

Lock Nul 1/4'-20

Nut 3/8'

Lock Washer 3/8'

Advertising
This manual is related to the following products: