EFCO E-Lite User Manual

Page 5

Advertising
background image

EFCO CORPORATION 6/2012 PART NO. YWLS

Page 5 of 19

E-Lite Fabrication, Assembly and Installation Instructions

Section II: E-Lite “Stick Built” Channel Base Assembly

#13D8


1.) Fabricate, Assemble, and Anchor E-Lite Channel Base.

A.) Start with the channel base. Cut to length, locate and drill all anchor and support strut attachment holes.

B.) Attach all struts with the lead-point attachment screws through the channel base into the strut and tighten firmly.

C.) Attach the channel base support / strut assembly to the glazed wall product or substrate with

*

appropriate size and

quantity of fasteners. (

*

Attachment fasteners are only sized and provided by EFCO when attachment is to EFCO material.)

Light Shelf support strut, centerline to centerline

spacing not to exceed 24” O.C.

Strut attachment screws

Channel base anchor screws (N.B.E.)

Strut attachment
holes (4 per strut)

Channel Base anchor holes

*

Channel Base

Channel Base

*

Horizontal framing mullion or vertical wall substrate

Channel Base

Support Strut

Advertising