Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5

Section 19 - Frame Assembly - Vent at Stack Sill

1. Assembly the concealed vent unit frame. Refer to Volume 1 and Volume 2 of the S-8000 Unitized Curtain Wall Assembly Instructions for assembly details as

noted below.

Figure 10

Refer to Volume 1, Page 32 - 33

for anchor assembly and

application.

Refer to Volume 1, Page 34 for

frame assembly.

Refer to Volume 1, Page 29 - 30

“Z” clip installation.

Refer to Volume 1, Page 26 for

mullion gasket installation.

Refer to Volume 1, Page 27 - 28

for Frame Pad application.

Stack Head

Refer to Volume 1, Page 35 for
Mullion Splice Bar application.

Intermediate

Horizontal

1H65 Concealed

Vent Stack Sill

17K2 Concealed

Vent Horizontal

H11B Frame Pad

Refer to Volume 1, Page 27 - 28

for frame pad application.

H11B Frame Pad

Refer to Volume 1, Page 27 - 28

for frame pad application.