EFCO 8800 Series Assembly Instructions Vol.5 User Manual

Page 37

Advertising
background image

EFCO 2009

Page 37

Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5

Section 24 - Captured Vent Unit Glazing at Fixed Horizontal : B. Setting and Caulking Glazing

Figure 59

Set glazing onto the silicone
spacer gaskets and against
the setting blocks at the
temporary glazing locators.

1. Set the glazing on the silicone spacer gaskets making sure glazing is pressed firmly onto the setting blocks of the temporary retainers.
2. Refer to Volume 2, pages 20 and 21 of the S-8000 Unitized Curtain Wall Assembly Instructions for assembly details and notes.

HEAD

SILL

Note:
Unit frame squareness is critical when
operable units are incorporated into
the unit. The taller the operable unit
becomes, the more important that the
frame is completely square.

Temporary Glazing

Locators (KV03)

Temporary Glazing

Locators (KV04)

Concealed Vent

opening

Advertising
This manual is related to the following products: