EFCO 8800 Series Assembly Instructions Vol.5 User Manual

Page 21

Advertising
background image

EFCO 2009

Page 21

Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5

Section 22 - SSG Vent Unit Glazing at Fixed Horizontal : A. Temporary Glazing Locators

Figure 27

1. Apply two temporary glazing locators (KV01 and KV02) with isolators and setting blocks at approximate quarter points at the sill and intermediate horizontal

locations.

2. Refer to Volume 2, page 8 and 9 of the S-8000 Unitized Curtain Wall Assembly Instructions for assembly details and notes.

Temporary Glazing

Locators (KV02)

Temporary Glazing

Locators (KV01)

HEAD

SILL

Concealed Vent

opening

Intermediate Horizontal

Stack Sill

Intermediate

Horizontal

Stack Sill

KV01

KV02

Advertising
This manual is related to the following products: