1 dual channel units (s-xd base), 2 dual channel – remote scale setup, 7 wire specifics – Rice Lake Counterpart Configurable Counting Indicator - Installation and Operation Manual V2.3 - Rev C User Manual
Page 17: 6 load cell wiring, Dual channel units (s-xd base), Dual channel – remote scale setup
Installation
11
2.6.1
Dual Channel Units (S-XD Base)
For units that have dual channels, connect cable from the 14 pin connector to J1 and J2. If not using a dual base,
remove the J2 connector as shown in Figure 2-8. Trim back the wires and tape.
Figure 2-7. J2 Connector Location
2.6.2
Dual Channel – Remote Scale Setup
For units that have dual channels and want to set up a scale remotely, use the following steps:
1. Remove the connector from the parts bag (included).
2. Wire per the load cell wiring code.
3. Plug into the J2 connector on the CPU board (example shown in Figure 2-7).
4. Set up the soft key - Scale Select (see Section 3.7 on page 27).
Figure 2-8. Remove J2 Connector if Using Single Base Scale or Only Single Base on a Dual Base
2.7
Wire Specifics
Wires connecting to J1, J2, J3, or J4 should adhere to the following specifications:
Wire Range
Wire Strip Length
28~12 AWG stranded or solid wire
5~6 mm (3/16" ~ 1/4")
Table 2-2. Wire Specifications for Connectors
Shown connectors shipped
from the factory.
Remove connector off of J2
and tie off two wires.
J1 connector