Rice Lake Washdown User Manual

Page 11

Advertising
background image

CELL 1

CELL 4

CELL 2

CELL 3

INDICATOR

+EX

–EX

+SI

–SI

100 K

+SE

–SE

+EX

+EX

+EX

+EX

–EX

–EX

–EX

–EX

+SI

+SI

+SI

+SI

–SI

–SI

–SI

–SI

SHD

SHD

SHD

SHD

23126

Rev. A

SHD

JU1

JU2

JU3

JU4

100 K

100 K

100 K

Installation

7

Figure 2-3. Junction Box Indicator Terminal

The cable must be routed to the indicator in a manner that will protect the cable from damage. Two methods of
cable protection in non-washdown applications are shown in Figure 2-4. When planning cable routing with either
of these two methods, leave a loose coil of excess cable under the scale to facilitate future lifting of the scale for
servicing or cleaning.

LOAD CELL CABLE

STEEL COVER

FLOOR

SCREW

LOAD CELL CABLE

STEEL COVER

Figure 2-4. Cable Protection

Strain Relief
Flex Fitting

Figure 2-5. Standard Junction Box

Note

In washdown applications, we recommend removing the junction box entirely from the floor
platform and mounting it externally on a wall or in some other protected location.

When the interface cable is protected and in its final
position, complete connections to the indicator.

See indicator installation manual for wiring
information.

1. If necessary, trim corners as described in

Section 3.2.

2. Check all strain relief fittings for tightness.

3. Screw on the junction box cover.

4. Slide the junction box tray into the cutout.

5. Secure it with the two #10 x 3/8" screws

provided.